Gå direkte til innhold

Prosjektarkiv

 
 
256treff
PeriodeProsjekttittelProsjektleder
2007 - 2009

Ship Based Production And Transportation Of Hlg (Heavy Liquified Gas)

Ship Based Production And Transportation Of Hlg (Heavy Liquified Gas)
Åse Slagtern
2007 - 2011

Qualification of Subsea Hybrid Pump

Qualification of Subsea Hybrid Pump
Hæge Busland
2007 - 2008

High Temperature Vessel Internal Electrostatic Coalescer with water profiling system

High Temperature Vessel Internal Electrostatic Coalescer with water profiling system
Gorm Sande
2007 - 2008

ZipLog well logging system using fiber optic technology

ZipLog well logging system using fiber optic technology
Terje Eliassen
2007 - 2011

Drilling Operations Tracking System for drill pipe life cycle management, supply chain-and drilling operations management

Drilling Operations Tracking System for drill pipe life cycle management, supply chain-and drilling operations management
Asbjørn Nygård
2007 - 2010

Smart mud system for mud handling and drill cuttings removal.

Smart mud system for mud handling and drill cuttings removal.
Torgeir Haaland
2007 - 2008

Verification of a directional seabed seismic source at Gjøa for shallow waterflow and shallow gas investigations

Verification of a directional seabed seismic source at Gjøa for shallow waterflow and shallow gas investigations
John H. Løvholt
2007 - 2009

Fiber Optic Reservoir Monitoring

Fiber Optic Reservoir Monitoring
Roar Helge Iversen
2007 - 2007

Development of a 250T Fibre Rope Deployment System (FRDS)

Development of a 250T Fibre Rope Deployment System (FRDS)
Pål Johnny Hellevik
2007 - 2009

Monitoring sea ice thickness from a subsea multibeam sonar.

Monitoring sea ice thickness from a subsea multibeam sonar.
Stein Sandven
2007 - 2013

Permanently Installed Downhole 3-Phase Flowmeter: Field Qualification and Performance Evaluation

Permanently Installed Downhole 3-Phase Flowmeter: Field Qualification and Performance Evaluation
Espen Johansen
2007 - 2011

Permanently Installed Fiber Optic Monitoring System for Array Temperature Sensing - Field Qualification and Performance Evaluation

Permanently Installed Fiber Optic Monitoring System for Array Temperature Sensing - Field Qualification and Performance Evaluati
Birger Olav Sørebø
2006 - 2009

Offshore Arctic Data Collaboration Project - Phase I

Offshore Arctic Data Collaboration Project - Phase I
Kjell-Are Vassmyr
2006 - 2007

Development of a Remote Geo-technical Coring and Seabed Sampling System for deepwater and harsh Northern environments

Development of a Remote Geo-technical Coring and Seabed Sampling System for deepwater and harsh Northern environments
Tom Hasler
2006 - 2009

Qualify and demonstrate a fully insulated direct electrical heating (DEH) system for flowlines and risers

Qualify and demonstrate a fully insulated direct electrical heating (DEH) system for flowlines and risers
Trond Schjelderup
2006 - 2013

DEMO2000 - Downhole Production Monitoring System Pilot Manufacture and Installation

DEMO2000 - Downhole Production Monitoring System Pilot Manufacture and Installation
Klas Bergquist
2006 - 2008

Low Power Drilling using Plasma Channel Drilling (PCD) Technology

Low Power Drilling using Plasma Channel Drilling (PCD) Technology
Kim Røed
2006 - 2009

Unislips - a new multidimensional slips covering all pipe dimensions

Unislips - a new multidimensional slips covering all pipe dimensions
Helge-Ruben Halse
2006 - 2007

MODU Mooring System JIP

MODU Mooring System JIP
Pål Johnny Hellevik
2006 - 2009

Phase 2, Borehole Seismic Source and Receiver system for Reservoir description and IOR

Phase 2, Borehole Seismic Source and Receiver system for Reservoir description and IOR
Ottar A. Sandvin
2006 - 2009

High resolution real-time updated reservoir model

High resolution real-time updated reservoir model
Øyvind Rideng
2006 - 2008

Power supply to offshore installations from floating windturbines

Power supply to offshore installations from floating windturbines
Øystein Teigland
2006 - 2008

High pressure composite containment system for associated gas or well-stream storage and transportation

High pressure composite containment system for associated gas or well-stream storage and transportation
Alf Petter Olsen
2006 - 2007

eCAD phase 2

eCAD phase 2
Øyvind Rideng
2006 - 2010

Process Qualification - Phase II

Process Qualification - Phase II
Ketil Firing Hanssen
2006 - 2007

Vispo3D phase 3

Vispo3D phase 3
Øyvind Rideng
2006 - 2008

RMR DeepWater JIP

RMR DeepWater JIP
Roger Stave
2006 - 2008

CannSeal phase 2

CannSeal phase 2
Bengt Gunnarsson
2006 - 2007

CannSeal phase 2

CannSeal phase 2
Bengt Gunnarsson
2006 - 2008

Enhanced Oil Recovery by use of specialist chemicals

Enhanced Oil Recovery by use of specialist chemicals
Bjørn Myklatun