| 2007 - 2009 | Ship Based Production And Transportation Of Hlg (Heavy Liquified Gas) | Åse Slagtern |
| 2007 - 2011 | Qualification of Subsea Hybrid Pump | Hæge Busland |
| 2007 - 2008 | High Temperature Vessel Internal Electrostatic Coalescer with water profiling system | Gorm Sande |
| 2007 - 2008 | ZipLog well logging system using fiber optic technology | Terje Eliassen |
| 2007 - 2011 | Drilling Operations Tracking System for drill pipe life cycle management, supply chain-and drilling operations management | Asbjørn Nygård |
| 2007 - 2010 | Smart mud system for mud handling and drill cuttings removal. | Torgeir Haaland |
| 2007 - 2008 | Verification of a directional seabed seismic source at Gjøa for shallow waterflow and shallow gas investigations | John H. Løvholt |
| 2007 - 2009 | Fiber Optic Reservoir Monitoring | Roar Helge Iversen |
| 2007 - 2007 | Development of a 250T Fibre Rope Deployment System (FRDS) | Pål Johnny Hellevik |
| 2007 - 2009 | Monitoring sea ice thickness from a subsea multibeam sonar. | Stein Sandven |
| 2007 - 2013 | Permanently Installed Downhole 3-Phase Flowmeter: Field Qualification and Performance Evaluation | Espen Johansen |
| 2007 - 2011 | Permanently Installed Fiber Optic Monitoring System for Array Temperature Sensing - Field Qualification and Performance Evaluati | Birger Olav Sørebø |
| 2006 - 2009 | Offshore Arctic Data Collaboration Project - Phase I | Kjell-Are Vassmyr |
| 2006 - 2007 | Development of a Remote Geo-technical Coring and Seabed Sampling System for deepwater and harsh Northern environments | Tom Hasler |
| 2006 - 2009 | Qualify and demonstrate a fully insulated direct electrical heating (DEH) system for flowlines and risers | Trond Schjelderup |
| 2006 - 2013 | DEMO2000 - Downhole Production Monitoring System Pilot Manufacture and Installation | Klas Bergquist |
| 2006 - 2008 | Low Power Drilling using Plasma Channel Drilling (PCD) Technology | Kim Røed |
| 2006 - 2009 | Unislips - a new multidimensional slips covering all pipe dimensions | Helge-Ruben Halse |
| 2006 - 2007 | MODU Mooring System JIP | Pål Johnny Hellevik |
| 2006 - 2009 | Phase 2, Borehole Seismic Source and Receiver system for Reservoir description and IOR | Ottar A. Sandvin |
| 2006 - 2009 | High resolution real-time updated reservoir model | Øyvind Rideng |
| 2006 - 2008 | Power supply to offshore installations from floating windturbines | Øystein Teigland |
| 2006 - 2008 | High pressure composite containment system for associated gas or well-stream storage and transportation | Alf Petter Olsen |
| 2006 - 2007 | eCAD phase 2 | Øyvind Rideng |
| 2006 - 2010 | Process Qualification - Phase II | Ketil Firing Hanssen |
| 2006 - 2007 | Vispo3D phase 3 | Øyvind Rideng |
| 2006 - 2008 | RMR DeepWater JIP | Roger Stave |
| 2006 - 2008 | CannSeal phase 2 | Bengt Gunnarsson |
| 2006 - 2007 | CannSeal phase 2 | Bengt Gunnarsson |
| 2006 - 2008 | Enhanced Oil Recovery by use of specialist chemicals | Bjørn Myklatun |