| 2000 - 2001 | Pipe train, mechanical device for hydrate plug removal | Johannes S. Vikane |
| 2008 - 2011 | Field implementation and demonstration of PerForM? with Multiple Migration for down-hole monitoring in oil/gas production and CO | John Buss |
| 2005 - 2007 | Field implemention and demonstration of PerForM tm for optimized seismic monitoring of the reservoir. | John Buss |
| 2004 - 2006 | Downhole gravity slip separator | John Friedemann |
| 2007 - 2008 | Verification of a directional seabed seismic source at Gjøa for shallow waterflow and shallow gas investigations | John H. Løvholt |
| 2002 - 2009 | OptoRiser - Manufacturing and testing of a flexible riser including a fibre-optic monitoring system with integrated sensors for | Jon Thomas Kringlebotn |
| 2008 - 2009 | Installation of Two Permanent Deep Penetrating Anchors at the Gjøa Field in the North Sea | Jon Tore Lieng |
| 2012 - 2013 | The Development and Qualification of a Compact Subsea Oil/Water Separation System | Jostein Kolbu |
| 2000 - 2001 | Multilateral Well at Ullrigg Drilling and Well Centre, phase 2 | Jostein Sørbø |
| 1999 - 2000 | Multilateral Well at Ullrigg Drilling and Well Centre | Jostein Sørbø |
| 2001 - 2002 | Offshore Cryogenic Loading - Full scale Test. | Jørgen Eide |
| 2002 - 2003 | OCL - Demo 2000 | Jørgen Eide |
| 1999 - 2001 | Subsea Wet Gas Compressor | Jørgen Eide |
| 2002 - 2002 | Testing Wet Gas Compressor - Subsea Wet Gas Compressor | Jørgen Eide |
| 2004 - 2005 | Pilot installation of the Wet Gas Compressor WGC2000 on a live gas field in the North Sea | Jørgen Eide |
| 2005 - 2006 | Development of a new PMS (Production/Pipeline Management System) platform that enables e-Operations | Jørn Sikkerbøl |
| 2000 - 2001 | Pilot Installation of a Subsea Centrifugal Separator System | Jørund Birkeland |
| 2006 - 2010 | Process Qualification - Phase II | Ketil Firing Hanssen |
| 2006 - 2008 | Low Power Drilling using Plasma Channel Drilling (PCD) Technology | Kim Røed |
| 2005 - 2009 | Safe Breakaway Joint | Kjell Gunnar Koppangen |
| 2008 - 2009 | Hybrid Riser Solution for Deep Water & Harsh Environments - Phase 2 | Kjell Hagatun |
| 2005 - 2008 | Hybrid Riser Solution, in combination with FPSO, for Deepwater and Harsh Environmental Conditions | Kjell Hagatun |
| 1999 - 2001 | Kvalifisering av Trykkpuls og IDUN for masseratemåøinger på undervannsbrønner | Kjell Korsan |
| 2002 - 2004 | Subsea Gas Booster Qualification Porject (SGBQP) | Kjell Olav Stinessen |
| 2006 - 2009 | Offshore Arctic Data Collaboration Project - Phase I | Kjell-Are Vassmyr |
| 2005 - 2006 | Demo 2000 Artic Project - Phase 1 | Kjell-Are Vassmyr |
| 2006 - 2013 | DEMO2000 - Downhole Production Monitoring System Pilot Manufacture and Installation | Klas Bergquist |
| 1999 - 2002 | Deep Water Export System | Knut Beck Engebretsen |
| 2004 - 2007 | DeepBoosterTM System | Knut Nyborg |
| 2012 - 2013 | Pilottesting og teknologikvalifisering av system for trådløs gassdeteksjon | Knut Sandven |