| 2000 - 2003 | PETRA; Ferdigstillelse av 4. generasjons transient flerfase beregningsverktøy | Tor Haugset |
| 2000 - 2001 | Design and qualification of a fibre-optic integrity monitoring system for flexible risers, Phase 2 - Destructive testing of test | Arne Berg |
| 2000 - 2002 | Qualification of fast-response control solution for modular, compact cyclonic separator system | Svein O. Klemetsen |
| 2000 - 2002 | Subsea Centrifugal Compressor Module | Mehdi Navidi |
| 2000 - 2001 | 4C measurements in horizontal wells | Helge Brandsæter |
| 2000 - 2004 | SILD-A New concept for Well Testing and Reservoir Fluid Sampling | Bjørn Dybdahl |
| 2000 - 2001 | Promac 2001 | Harald Schmidt |
| 2000 - 2002 | Phase 1: Manufacturing and Verification of Comp Tether Prototype | Turid Storhaug |
| 2000 - 2002 | Design and qualification of permanently installed in-well multi-component multistation seismic system | Sverre Knudsen |
| 2000 - 2002 | DEMO2000: ELSA (Electric Subsea Actuator) | Tom Kjønigsen |
| 2000 - 2001 | Overflatestyrt Brønnkompletteringssystem med Rotasjonsmuffer (NESCOS) | Bengt Gunnarsson |
| 2000 - 2002 | Onshore testing of a new, cost effective lateral-drilling-tool (water -jet) for enhanced oil recovery | Per Buset |
| 2000 - 2002 | Production qualification of strongly dynamically exposed large diameter titanium risers (Ti-Rise) | Per-Arne Røstadsand |
| 2000 - 2001 | Multilateral Well at Ullrigg Drilling and Well Centre, phase 2 | Jostein Sørbø |
| 2000 - 2002 | Compact, Integrated Modular Subsea Process for Low Cost Deployment and Operation. | Jo Jernsletten |
| 2000 - 2003 | Prevention of Hydrate Formation in Riser Systems | Vidar Halvorsen |
| 2000 - 2001 | Pipe train, mechanical device for hydrate plug removal | Johannes S. Vikane |
| 2000 - 2001 | Instrumentation for Horizontal Downhole Separation | Eivind Dahl |
| 2000 - 2001 | Pilot Installation of a Subsea Centrifugal Separator System | Jørund Birkeland |
| 2000 - 2006 | Utvikling og kvalifisering av fiberoptisk nedihulls instrumentering for bestemmelse av flerfase strømningsrater | Hilde Nakstad |
| 2000 - 2001 | Downhole Oil-In-Water-Monitoring (OIWM) | Harald Wiken |
| 2000 - 2001 | Forstudie-Seismic Reservoir Monitoring by Permanent Down-hole Installations | Helge Brandsæter |
| 1999 - 2002 | Light Weight Risers | Lars Slagsvold |
| 1999 - 2002 | Deep Water Export System | Knut Beck Engebretsen |
| 1999 - 2001 | Subsea Wet Gas Compressor | Jørgen Eide |
| 1999 - 2001 | Forstudie-Reservoar monitorering Statfjord feltet; Aktiv - Passiv lytting, grunne vertikale brønner - metode og teknologiutvikli | Terje Sirevaag |
| 1999 - 2001 | Downhole Horizontal Separator- Qualification for offshore test instalation | Gunder Homstvedt |
| 1999 - 2001 | Subsea electrical power distribution system | Svend Rocke |
| 1999 - 2000 | Multilateral Well at Ullrigg Drilling and Well Centre | Jostein Sørbø |
| 1999 - 2002 | Fjernassistanse | Trond Rese |