| 2008 - 2010 | Prototype test of submerged fully automated drilling rig | Lars Raunholt |
| 2008 - 2013 | CMP Dual Gradient Drilling JIP | Roger Stave |
| 2008 - 2013 | Rotating T-sensor for accurate and reliable field gradient measurements to determine the corrosion protection of pipelines and s | Jens Christofer Werenskiold |
| 2008 - 2011 | Real-time reservoir simulation and management | Eigil Samset |
| 2008 - 2009 | Hybrid Riser Solution for Deep Water & Harsh Environments - Phase 2 | Kjell Hagatun |
| 2008 - 2011 | SIMLA.Installation - On board monitoring, analysis and decision support during offshore pipe lay operation | Egil Giertsen |
| 2008 - 2010 | eDrilling Qualification and Demonstration | Sven Inge Ødegård |
| 2008 - 2011 | Global Virtual Integrated Collaboration Environment for Real-Time Drilling Decisions | Rune Skarbø |
| 2008 - 2010 | Environmentally friendly chemical tracers for production monitoring in sensitive Arctic areas | Anne Dalager Dyrli |
| 2008 - 2010 | Development and qualification of technical solutions for an electrically controlled subsea x-mas tree | Tor Berge Gjersvik |
| 2008 - 2011 | Next Generation Kill and Choke Lines | Per Kristian Grønlund |
| 2008 - 2009 | Ice Model Testing of Structures with a Downward breaking Cone in the Waterline | Per Kristian Bruun |
| 2008 - 2009 | Pilot testing of Abbon Flow Master at Ekofisk 2/4 M | Audun Aspelund |
| 2008 - 2010 | Productification of Wireless Vibration sensor | Tor Ole Bang-Steinsvik |
| 2008 - 2010 | Sub-bottom Acoustic Imaging Development | Jan Arvid Ingulfsen |
| 2008 - 2010 | Seabed Water Injection and Treatment - Pilot Plant | Jan-Olav Hallset |
| 2008 - 2011 | Heavy Duty Fibre Rope Deployment System JIP Phase 1 - Rope testing programme | 0 0 |
| 2008 - 2009 | Next Generation Drilling Riser Main Pipe | Per Kristian Grønlund |
| 2008 - 2011 | Field implementation and demonstration of PerForM? with Multiple Migration for down-hole monitoring in oil/gas production and CO | John Buss |
| 2008 - 2012 | Next generation oil spill technology for Arctic and ice covered waters | Stein Erik Sørstrøm |
| 2008 - 2011 | Composite Cable Well Intervention - System Qualification | Peter Bergsland |
| 2007 - 2009 | SATURN Cold Flow demonstration project | Roar Larsen |
| 2007 - 2009 | ReelWell - Drilling Concept - Demonstration Jointed Pipe Version | Ola Michael Vestavik |
| 2007 - 2008 | MiniLNG Pilot Plant | Nils Spidsøe |
| 2007 - 2010 | 250T FRDS JIP Phase 3 & 4 | Pål Johnny Hellevik |
| 2007 - 2010 | Partitioning Interwell Tracer Test to measure oil saturation | Øyvind Dugstad |
| 2007 - 2009 | Vispo3D Reservoir Management | Øyvind Rideng |
| 2007 - 2009 | eCAD - utilizing existing CAD models in eField real-time 3D visualization | Øyvind Rideng |
| 2007 - 2009 | PRODML Pilot for Production Optimization and Intuitive Crisis Management | Per Arild Andresen |
| 2007 - 2009 | Real-Time Drilling Automated Analysis and Decision Support System | Jan Kåre Igland |