Gå direkte til innhold

Prosjektarkiv

 
 
239treff
PeriodeProsjekttittelProsjektleder
2013 - 2015

New generation subsea dp sensor for subsea single and multiphase meters

New generation subsea dp sensor for subsea single and multiphase meters
Martin Nygaard
2013 - 2014

Subsea Power Grid System Integration Test

Subsea Power Grid System Integration Test
Anngjerd Pleym
2012 - 2014

Bruk av pre-installert tracer for å detektere fordeling av scale beskyttende kjemikaler i brønner.

Bruk av pre-installert tracer for å detektere fordeling av scale beskyttende kjemikaler i brønner.
Ole Magnar Drønen
2012 - 2014

Resonator high frequency electrified hammer for cost efficient well intervention and percussion drilling

Resonator high frequency electrified hammer for cost efficient well intervention and percussion drilling
André Dahl-Jacobsen
2012 - 2013

LIRA Condition Monitoring of energized Power- Umbilical/cable. Pilot testing to optimize LIRA technology and design/setup of couples

LIRA Condition Monitoring of energized Power- Umbilical/cable. Pilot testing to optimize LIRA technology and design/setup of c
Tore Johan Høilund
2012 - 2013

System qualification and pilot testing of ORS' Low Riser Return System

System qualification and pilot testing of ORS' Low Riser Return System
Per Chr. Stenshorne
2012 - 2015

Dual-Reheat Supercritical CO2 (DReSCO) Bottoming Cycle for Offshore Gas Turbines to improve efficiency and reduce emissions.

Dual-Reheat Supercritical CO2 (DReSCO) Bottoming Cycle for Offshore Gas Turbines to improve efficiency and reduce emissions.
Morten Wiencke
2012 - 2013

Development and Qualification VAM Visual Asset Management software and 3D Measurements from 360° Panorama photographs

Development and Qualification VAM Visual Asset Management software and 3D Measurements from 360° Panorama photographs
Per Erik Berger
2012 - 2013

Build Pilot of Continuous Drilling and Circulation Unit (CDU)

Build Pilot of Continuous Drilling and Circulation Unit (CDU)
Odd Børge Skjærseth
2012 - 2014

Development of a new generation Wireline Intervention System and Pilot Offshore Job

Development of a new generation Wireline Intervention System and Pilot Offshore Job
Morten Talgø
2012 - 2014

Condition monitoring of hydraulic- and subsea machinery

Condition monitoring of hydraulic- and subsea machinery
Per Svein Flø
2012 - 2013

The Development and Qualification of a Compact Subsea Oil/Water Separation System

The Development and Qualification of a Compact Subsea Oil/Water Separation System
Jostein Kolbu
2012 - 2014

Reelwell Drilling Method-Applications for Subsea Wells-Riserless Drilling of Presalt Wells

Reelwell Drilling Method-Applications for Subsea Wells-Riserless Drilling of Presalt Wells
Arnfinn Nergaard
2012 - 2014

Badger Explorer Seismic Field Demonstrator

Badger Explorer Seismic Field Demonstrator
Tor-Olav Berntzen
2012 - 2013

Pilottesting og teknologikvalifisering av system for trådløs gassdeteksjon

Pilottesting og teknologikvalifisering av system for trådløs gassdeteksjon
Knut Sandven
2011 - 2013

Simulator-based Virtual Flow Allocation for Atla, Byggve and Skirne Field Developments

Simulator-based Virtual Flow Allocation for Atla, Byggve and Skirne Field Developments
Arne Aas
2011 - 2013

Build Pilot of CMR Rig at Ullrigg Test Centre

Build Pilot of CMR Rig at Ullrigg Test Centre
Odd Børge Skjærseth
2011 - 2013

Subsea Membrane Testing

Subsea Membrane Testing
Øyvind Espeland
2011 - 2014

Method for remote cleaning and internal inspection of process vessels enabling cost savings and reduced risks to personnel and environment

Method for remote cleaning and internal inspection of process vessels enabling cost savings and reduced risks to personnel and e
Hans Leirvik
2011 - 2013

SmartPipe Pilot Project

SmartPipe Pilot Project
Ole Øystein Knudsen
2011 - 2012

Meso-Scale Floater Pilot at Spitsbergen

Meso-Scale Floater Pilot at Spitsbergen
Per Kristian Bruun
2011 - 2013

Cost effective insulation system for subsea pipelines

Cost effective insulation system for subsea pipelines
Grethe Hartviksen
2011 - 2013

CODIO Pilot

CODIO Pilot
Roar A. Fjellheim
2011 - 2012

Slug Capturing Model in LedaFlow

Slug Capturing Model in LedaFlow
Steinar Øyulvstad
2011 - 2013

Active Acoustic leak detection of oil and gas from sub sea installation

Active Acoustic leak detection of oil and gas from sub sea installation
Terje Torkelsen
2010 - 2013

Reelwell - Extended Reach Drilling beyond 20 km

Reelwell - Extended Reach Drilling beyond 20 km
Ola Michael Vestavik
2010 - 2013

OCTIO GEOPHYSICAL DEMO2000 - A solution for advance warning of leakage to surface from waste injection wells

OCTIO GEOPHYSICAL DEMO2000 - A solution for advance warning of leakage to surface from waste injection wells
Leon Løvheim
2010 - 2013

Subsea Cooler Qualification

Subsea Cooler Qualification
Eirik Archer
2010 - 2012

Nanocoating for hydrate prevention in subsea production systems

Nanocoating for hydrate prevention in subsea production systems
Terje Glomsaker
2010 - 2012

Reactive Flex Joint

Reactive Flex Joint
Tor Berge Gjersvik